EUR-Lex & EU Commission AI-Powered Semantic Search Engine
Modern Legal
  • Query in any language with multilingual search
  • Access EUR-Lex and EU Commission case law
  • See relevant paragraphs highlighted instantly
Start free trial

Similar Documents

Explore similar documents to your case.

We Found Similar Cases for You

Sign up for free to view them and see the most relevant paragraphs highlighted.

Case T-281/16 R: Order of the President of the General Court of 11 November 2016 — Solelec and Others v Parliament (Interim measures — Public works contracts — Tendering procedure — Electrical work (high-voltage current) as part of the project for the extension and refurbishment of the Parliament’s Konrad Adenauer building in Luxembourg — Rejection of the bid submitted by a tenderer and decision to award the contract to another tenderer — Application for suspension of operation of a measure — Lack of urgency)

ECLI:EU:UNKNOWN:62016TB0281

62016TB0281

November 11, 2016
With Google you find a lot.
With us you find everything. Try it now!

I imagine what I want to write in my case, I write it in the search engine and I get exactly what I wanted. Thank you!

Valentina R., lawyer

9.1.2017

Official Journal of the European Union

C 6/38

(Case T-281/16 R)

((Interim measures - Public works contracts - Tendering procedure - Electrical work (high-voltage current) as part of the project for the extension and refurbishment of the Parliament’s Konrad Adenauer building in Luxembourg - Rejection of the bid submitted by a tenderer and decision to award the contract to another tenderer - Application for suspension of operation of a measure - Lack of urgency))

(2017/C 006/48)

Language of the case: French

Parties

Applicants: Solelec SA (Esch-sur-Alzette, Luxembourg), Mannelli & Associés SA (Bertrange), Paul Wagner et fils SA (Luxembourg), Socom SA (Foetz) (represented by: S. Marx, lawyer)

Defendant: European Parliament (represented by: M. Mraz and L. Chrétien, agents)

Re:

Action on the basis of Articles 278 TFEU and 279 TFEU seeking suspension of the operation, first, of the decision of the Parliament of 27 May 2016 to reject the tender submitted by the applicants for lot No 75 in connection with a call for tenders with reference INLO-D-UPIL-T-15-AO6, concerning the project for the extension and refurbishment of the Konrad Adenauer building in Luxembourg and, secondly, of the decision awarding that lot to another tenderer.

Operative part of the order

1.The application for interim measures is dismissed.

2.The order of 9 June 2016 delivered in Case T-281/16 R is set aside.

3.The costs are reserved.

EurLex Case Law

AI-Powered Case Law Search

Query in any language with multilingual search
Access EUR-Lex and EU Commission case law
See relevant paragraphs highlighted instantly

Get Instant Answers to Your Legal Questions

Cancel your subscription anytime, no questions asked.Start 14-Day Free Trial

At Modern Legal, we’re building the world’s best search engine for legal professionals. Access EU and global case law with AI-powered precision, saving you time and delivering relevant insights instantly.

Contact Us

Tivolska cesta 48, 1000 Ljubljana, Slovenia