I imagine what I want to write in my case, I write it in the search engine and I get exactly what I wanted. Thank you!
Valentina R., lawyer
(Case C-258/09) (<span class="super">1</span>)
(Failure of a Member State to fulfil obligations - Directive 2008/1/EC - integrated pollution prevention and control - Failure to transpose within the prescribed period)
2010/C 113/20
Language of the case: French
Applicant: Commission of the European Communities (represented by: A. Alcover San Pedro and A. Marghelis, Agents)
Defendant: Kingdom of Belgium (represented by: T. Materne, Agent)
Failure to adopt or communicate, within the prescribed period, the measures necessary to comply, in the Walloon Region, with Article 5(1) of Directive 2008/1/EC of the European Parliament and of the Council of 15 January 2008 concerning integrated pollution prevention and control (OJ 2008 L 24, p. 8) — Existing installations liable to have an effect on emissions into the air, water and soil and on pollution.
The Court:
1.Declares that, by authorising, in the Walloon Region, the operation of existing installations which do not comply with the requirements laid down in Articles 3, 7, 9, 10, 13, 14(a) and (b) and 15(2) of Directive 2008/1/EC of the European Parliament and of the Council of 15 January 2008 concerning integrated pollution prevention and control, despite the time-limit of 30 October 2007 as laid down in Article 5(1) of that directive, the Kingdom of Belgium has failed to fulfil its obligations under the directive;
2.Orders the Kingdom of Belgium to pay the costs.
(<span class="super">1</span>) OJ C 220, 12.9.2009.
* * *