I imagine what I want to write in my case, I write it in the search engine and I get exactly what I wanted. Thank you!
Valentina R., lawyer
The Competition DG makes the information provided by the notifying parties in section 1.2 of Form CO available to the public in order to increase transparency. This information has been prepared by the notifying parties under their sole responsibility, and its content in no way prejudges the view the Commission may take of the planned operation. Nor can the Commission be held responsible for any incorrect or misleading information contained therein.
National Grid and Elia System Operator NV/SA propose to establish a 50/50 full function joint venture (NEMO) consisting of a high voltage electricity transmission interconnector linking the electricity transmission networks of Great Britain and Belgium in order to facilitate electricity trading between the two markets. The NEMO joint venture will not itself trade electricity but will make available electricity transmission capacity to the British and Belgium markets through a mix of implicit and explicit auctions, in accordance with the Electricity Directive 2009/72/EC. The NEMO joint venture will make a pro-competitive contribution to the objective of creating a single European energy market by creating the interconnection of electricity markets in Great Britain and Belgium.