EUR-Lex & EU Commission AI-Powered Semantic Search Engine
Modern Legal
  • Query in any language with multilingual search
  • Access EUR-Lex and EU Commission case law
  • See relevant paragraphs highlighted instantly
Start free trial

Similar Documents

Explore similar documents to your case.

We Found Similar Cases for You

Sign up for free to view them and see the most relevant paragraphs highlighted.

Case T-175/14: Order of the General Court of 9 June 2015 — Walter Hundhausen v Commission (State aid — Measures adopted by Germany in favour of electricity generated from renewable energy sources and of energy-intensive undertakings — Decision to open the procedure under Article 108(2) TFEU — Adoption of the final decision after the action was brought — No need to adjudicate)

ECLI:EU:UNKNOWN:62014TB0175

62014TB0175

June 9, 2015
With Google you find a lot.
With us you find everything. Try it now!

I imagine what I want to write in my case, I write it in the search engine and I get exactly what I wanted. Thank you!

Valentina R., lawyer

Official Journal of the European Union

C 294/52

(Case T-175/14)(1)

((State aid - Measures adopted by Germany in favour of electricity generated from renewable energy sources and of energy-intensive undertakings - Decision to open the procedure under Article 108(2) TFEU - Adoption of the final decision after the action was brought - No need to adjudicate))

(2015/C 294/63)

Language of the case: German

Parties

Applicant: Walter Hundhausen GmbH (Schwerte, Germany) (represented by: H. Höfler, C. Kahle and V. Winkler, lawyers)

Defendant: European Commission (represented by: T. Maxian Rusche and R. Sauer, acting as Agents, and by C. Renner, lawyer)

Intervener in support of the defendant: EFTA Surveillance Authority (represented by: initially X. Lewis, M. Schneider and G. Mathisen, then X. Lewis, M. Schneider, M. Moustakali and C. Perrin, acting as Agents)

Re:

Application to annul in part Commission decision C (2013) 4424 final of 18 December 2013 to open the procedure under Article 108(2) TFEU regarding measures implemented by the Federal Republic of Germany in favour of renewable electricity and of energy-intensive users (State aid SA.33995 (2013/C) (ex 2013/NN)).

Operative part of the order

1.There is no longer any need to adjudicate on the present action.

2.There is no longer any need to adjudicate on the applications for intervention submitted by Flachglas Torgau GmbH and Saint-Gobain Isover G+H AG, by Kronotex GmbH & Co. KG and Kronoply GmbH, by Bayer MaterialScience AG, by Sabic Polyolefine GmbH, by Ineos Manufacturing Deutschland GmbH, Ineos Phenol GmbH and Ineos Vinyls Deutschland GmbH, and by Advansa GmbH, Akzo Nobel Industrial Chemicals GmbH, Aurubis AG, CBW Chemie GmbH, CFB Chemische Fabrik Brunsbüttel GmbH & Co. KG, Clariant Produkte (Deutschland) GmbH, Dralon GmbH, Hahl Filaments GmbH, Messer Produktionsgesellschaft mbH Siegen, Messer Produktionsgesellschaft mbH Salzgitter, Nabaltec AG, Siltronic AG and Wacker Chemie AG.

3.Walter Hundhausen GmbH shall bear its own costs and those incurred by the European Commission, including those relating to the proceedings for interim measures.

4.The EFTA Surveillance Authority shall bear its own costs.

(1)

OJ C 142, 12.5.2014.

EurLex Case Law

AI-Powered Case Law Search

Query in any language with multilingual search
Access EUR-Lex and EU Commission case law
See relevant paragraphs highlighted instantly

Get Instant Answers to Your Legal Questions

Cancel your subscription anytime, no questions asked.Start 14-Day Free Trial

At Modern Legal, we’re building the world’s best search engine for legal professionals. Access EU and global case law with AI-powered precision, saving you time and delivering relevant insights instantly.

Contact Us

Tivolska cesta 48, 1000 Ljubljana, Slovenia