I imagine what I want to write in my case, I write it in the search engine and I get exactly what I wanted. Thank you!
Valentina R., lawyer
The Competition DG makes the information provided by the notifying parties in section 1.2 of Form CO available to the public in order to increase transparency. This information has been prepared by the notifying parties under their sole responsibility, and its content in no way prejudges the view the Commission may take of the planned operation. Nor can the Commission be held responsible for any incorrect or misleading information contained therein.
1.The notified transaction concerns the proposed acquisition of sole control by GSEI, a subsidiary of GDFS, over certain companies currently belonging to the AE Joint Venture between GDFS and Italian utility group Acea S.p.A. The AE joint venture is composed of three separate companies operating, under the umbrella of a holding company (Acea Electrabel Holding S.p.A., “AEH”) at different level of the energy generation and supply chain, namely generation and wholesale supply of electricity (“AEP”), electricity and gas trading (“AET”) and electricity and gas retailing (“AEE”).
2.As a result of the transaction, GSEI will acquire sole control over AEP (save for a number of AEP production assets which will be transferred to Acea prior to the closing of the transaction) and over AET.
3.The notified Transaction will not have any impact on competition as it will result in change from joint to sole control.