I imagine what I want to write in my case, I write it in the search engine and I get exactly what I wanted. Thank you!
Valentina R., lawyer
(Case T-668/15) (<a id="ntc1-C_2018005EN.01003101-E0001" href="#ntr1-C_2018005EN.01003101-E0001"> (<span class="super note-tag">1</span>)</a>)
((Public supply contracts - Call for tenders - Supply of the Acceleration Grid Power Supply Conversion System - Rejection of a submitted tender - Transparency - Legal certainty - Equal treatment - Proportionality))
(2018/C 005/40)
Language of the case: Spanish
Applicant: Jema Energy, SA (Lasarte-Oria, Spain) (represented by: N. Rey Rey, lawyer)
Defendant: European Joint Undertaking for ITER and the Development of Fusion Energy (represented by: R. Hanak, G. Poszler and S. Bernal Blanco, acting as Agents, and by P. Wytinck and B. Hoorelbeke, lawyers)
Application based on Article 263 TFEU and seeking, inter alia, annulment of the decision of the European Joint Undertaking for ITER and the Development of Fusion Energy of 21 September 2015, taken in the context of the tendering procedure F4E-OPE-278, rejecting the applicant’s tender for Lot No 1 concerning the Acceleration Grid Power Supply Conversion System (AGPS-CS).
The Court:
1.Dismisses the action;
2.Orders Jema Energy, SA to pay the costs.
(<a id="ntr1-C_2018005EN.01003101-E0001" href="#ntc1-C_2018005EN.01003101-E0001">(<span class="super">1</span>)</a> OJ C 27, 25.1.2016).